Plastic Raw Material Storage
Big bags, 25 kg sacks and octabins. Stored dry and clean, every lot at its own rack location; temperature and humidity measured by sensor, receipt and dispatch scanned on the handheld terminal.
Plastic raw materials and paper reels. Both under one roof, in separate zones, each with its own equipment.
01TWO PRODUCT GROUPS
Plastic raw materials hate moisture and dirt; paper reels hate knocks and dents. The same rack and the same forklift don't suit both, so each has its own zone, its own equipment and its own checklist.
Big bags, 25 kg sacks and octabins. Stored dry and clean, every lot at its own rack location; temperature and humidity measured by sensor, receipt and dispatch scanned on the handheld terminal.
Moved with a clamp-attachment forklift and stacked with the surface and edges protected; humidity is monitored and the condition of each reel is recorded at receipt and dispatch.
Our space and equipment are set up for these two products. Tell us about your goods anyway; we'll look together at whether they fit.
Write to Us02PROCESS
Whatever the product, the load goes through the same six steps; what changes is the product rule applied at each one.
Vehicle and load details arrive; a time slot is booked.
Plate and seal checked at the gate, paperwork checked against the load at the dock; two signatures.
The warehouse declaration is registered; from that moment the goods are in stock.
The system assigns the rack location; the operator scans it on the terminal.
Stock counts, temperature and humidity readings and CCTV; any discrepancy is looked into on the same shift.
The lot named in the instruction is loaded, the dispatch record is signed, the gate log is closed.
QUOTE
Tell us your product group, volume and duration; our team will assess it and get back to you.
Quote Form